Loading Events

« All Events

  • This event has passed.

SD DOT meeting on “Highway 85 project” – Road work from Cheyenne Crossing to Wyoming

June 4 @ 5:30 pm - 7:00 pm

SD DOT meeting on “Highway 85 project” near Spearfish/Lead

Link to learn about the project:   https://dot.sd.gov/ushighway85towy

Public Meeting at,
Deadwood History
150 Sherman St.
Deadwood SD 57732
on 4 June 2026
at 5:30 to 7:00 PM
Some folks are concerned about impacts to scenic beauty due to changes to road template. I think – they project another major re-sculpting of landscape like what happened on 385 re-construction. Other possible concerns – improper culvert designs interfering with fish travel within surface waters, run off  from road effecting water quality in streams, especially Spearfish Creek, that supports American dipper..
============================

Project Needs and Goals:

Needs:

  • Reduce crash rates
  • Replace pavement
  • Replace drainage structures

Goals:

  • Protect the integrity of the corridor, protect the beauty of the Black Hills, while enhancing the experience for all users
  • Improve alignment and add shoulders where possible
  • Reduce impacts on the natural environment during construction

Tentative Project Timeline:

Preliminary Design: 2025
Public Meetings and Landowner Meetings: 2026
Tentative Construction: 2030/2031


Public Involvement:

Meeting Date: Thursday, June 4, 2026
Meeting Time: 5:30 p.m.-7 p.m. MT
Meeting Place: Homestake Adams Research and Cultural Center 150 Sherman St. Deadwood, SD 57732

Details

  • Date: June 4
  • Time:
    5:30 pm - 7:00 pm